Master bathroom renovation

A tub deck removed for a freestanding tub

The finished room: a freestanding tub under the same window, beside a floating wood vanity
Dated bathroom with beige tile, a glass block wall and a drop-in tub, the new fixtures still boxed
Before After

The job

The old drop-in tub sat in a tiled deck across the best window in the house. We took the deck out and stood a freestanding tub under the glass, on a floating vanity run down the opposite wall.

Category Bathrooms
Village —
Scope Master bathroom
Work Demolition, tile, plumbing, cabinetry
Status Completed
Licence CLB22-1786

Get started

Want something like this?

Estimates are free, including the on-site walkthrough. Call, text a photo, or send the details.