Service 02

Bathrooms

Curbless showers, cedar ceilings, custom vanities, wall niches, full re-tile.

What this covers

How we work

Bathrooms are small rooms with a lot of trades in them, which is why they go wrong. We build them properly — waterproofing first, then the finishes. Curbless showers, cedar ceilings, custom vanities, wall niches, and accessibility work where it is needed.

Included

  • Curbless and walk-in showers
  • Full re-tile, floor to ceiling
  • Custom and floating vanities
  • Whirlpool and soaking tubs
  • Wall niches and built-in seats
  • Accessibility modifications

Related work

Jobs like this

Finished jobs of this kind. Drag any slider to see what changed.

Rebuilt bathroom with a floating double vanity, black-framed mirrors and a curbless tiled shower

Bathrooms

A 7' × 15' view bathroom, rebuilt

A long, narrow bathroom rebuilt sleek and understated: a floating double vanity, a curbless shower with a linear drain, and large-format tile throughout.

Scope Full bathroom
Work Demolition, tile, cabinetry, plumbing
Status Completed

See the whole job →

Remodelled bathroom in grey marble-look tile with a wood plank ceiling and a teak folding seat
Bathroom with mint green striped wall tile, a mosaic floor and a blue shower curtain at the tub
Before After

Bathrooms

Green tile out, tiled soaking tub in

Mint green striped wall tile and a curtained tub alcove. It came back in grey marble-look tile with a wood plank ceiling, a teak folding seat and a white soaking tub.

Scope Full bathroom
Work Demolition, tile, plumbing, carpentry
Status Completed

See the whole job →

The finished room: a freestanding tub under the same window, beside a floating wood vanity
Dated bathroom with beige tile, a glass block wall and a drop-in tub, the new fixtures still boxed
Before After

Bathrooms

A tub deck removed for a freestanding tub

The old drop-in tub sat in a tiled deck across the best window in the house. We took the deck out and stood a freestanding tub under the glass, on a floating vanity run down the opposite...

Scope Master bathroom
Work Demolition, tile, plumbing, cabinetry
Status Completed

See the whole job →

The same corner in white large-format porcelain, with a recessed glass-shelf niche and a dark vanity
Beige tiled bathroom with a decorative border course, a glass block window and a cream laminate vanity
Before After

Bathrooms

A dated corner retiled around a new niche

Beige tile with a decorative border and a glass block window. The same corner came back in white large-format porcelain, with a recessed glass-shelf niche and an espresso vanity under a...

Scope Full bathroom
Work Demolition, tile, cabinetry, quartz
Status Completed

See the whole job →

Common questions

About bathrooms

Can a bathroom be made easier to use as we get older?

Yes, and it is worth deciding before the tiling goes in rather than after. A curbless shower, a built-in seat, blocking in the walls for grab rails and a wider doorway are all far cheaper as part of the job than as a change later.

Service area

We work island-wide on Guam

One crew, the whole island. No call-out charge for a walkthrough, wherever the job is.

  • Agana Heights
  • Agat
  • Asan-Maina
  • Barrigada
  • Chalan Pago-Ordot
  • Dededo
  • Hagåtña
  • Inarajan
  • Mangilao
  • Merizo
  • Mongmong-Toto-Maite
  • Piti
  • Santa Rita-Sumai
  • Sinajana
  • Talofofo
  • Tamuning
  • Umatac
  • Yigo
  • Yona

All 19 villages, north to south.

Get started

Need bathrooms?

Estimates are free, including the on-site walkthrough. Call, text a photo, or send the details.